Hartek Singh, CMD, Hartek Power.

Hartek Singh, CMD, Hartek Power.

While solar EPC will grow in proportion to the growth of solar industry, the government can set the tone for the robust growth of solar EPC business by enforcing guidelines pertaining to quality of equipment and world-class project management techniques. After all, these power plants have to run for a good 25 years. Solar EPC has proved to be a ...
Yoshiaki Inayama, MD of Toshiba JSW Power System

Yoshiaki Inayama, MD of Toshiba JSW Power System

For thermal power projects, a production schedule is established by TJPS to deliver its turbines and Generators at an appropriate time, based on the scope of the whole project including engineering & civil work, and building construction. Outside   Japan, for Toshiba, Toshiba JSW is the only other equipment manufacturing plant for thermal po...
B. Lal, Director General, ITMA

B. Lal, Director General, ITMA

The global production is about 3.5 million Metric tons (MT) per annum, whereas the present requirement of the Indian market/industry is about 3 lacs MT which is likely to go up to 4  to 5 lacs MT per year in the 12th plan period and would entail about 7.5 lakh MT per year at the end of 13th plan period. There is no shortage of material as such rath...
Dr. Kazuhiro Imaie, Managing Director of Hitachi Hi-Rel., Ahmedabad, India

Dr. Kazuhiro Imaie, Managing Director of Hitachi Hi-Rel., Ahmedabad, India

We are offering highly optimized energy solutions based on Hitachi technology. For Solar, we offer grid tied solar Inverters (HIVERTER NP 201i) which is available from 250 kW to 1.25 MW capacities. With 3 level IGBT technology and wider MPPT range, HHPE inverters are delivering considerably high reliability and maximum power generation. Please d...